GİMAK ENERGY GENERATION CO. LTD.Cesmebasi HEPP and Regulator on Kizilirmak river with an installed capacity of 8.6 MW and with an annual 56.160.000 kWh electricity generation capacity has been in operation since 12.01.2011 and is generating electricity. Company has joined into our group on 24.06.2013.
|